Air-conditioning and ventilation contractor for Singapore buildings.
Servicing contracts, installation and replacement including VRF systems and air handling units, and ACMV subcontract packages for main contractors.
Tenders and drawings: info@almondengineering.com.sg
BCA registered · ME01, Grade L1
Servicing, installation and subcontract packages.
Servicing contracts
Every unit on site serviced on a fixed cycle, priced per unit, with a service report every visit.
Scope and exclusions →02Installation and replacement
Split, multi-split, cassette, ducted and VRF systems, and air handling units. Model, capacity and exclusions stated on the quotation.
Scope and exclusions →03Subcontract packages
The ACMV package inside your fit-out or renovation, quoted to you as main contractor. Changes priced before the work.
Scope and exclusions →04Repairs
Fault-finding and repairs, with the fix quoted before any chargeable work.
Scope and exclusions →05Ventilation
Extract and fresh-air fans and ducting for kitchens, toilets, stores and plant rooms.
Scope and exclusions →06Site surveys
Every unit counted and condition-checked, with a written list you can budget or tender from.
Scope and exclusions →Chemical wash and chemical overhaul are quoted per unit, within a servicing contract or on their own. Work that needs a Licensed Electrical Worker is carried out with a licensed partner.
No surprises later.
Every quotation says what we will do and what is not included, so there is nothing to find out halfway through.
- Supply and install 2 no. ceiling cassette single split systems, c/w new refrigerant pipings
- Supply and install 1 no. System 3, c/w new refrigerant and condensate drain pipings
- Relocate 1 no. existing wall mounted unit to the pantry, c/w new pipings
Not included
- Builder’s works, hacking, coring and ceiling works
- Upgrades to the electrical supply or distribution board
Client, prices, quote number and date removed.
Clients and the work.
Named with their agreement.
Nefab Pte. Ltd.
A refrigerant leak traced and fixed, not topped up again.
What we did: Leak tracing · Repair · ServicingRead the case →INDUSTRIALAcertive Trading Pte. Ltd.
An office cassette replaced on new refrigerant pipework, pressure-tested before handover.
What we did: Replacement · Pipework · Pressure testRead the case →F&B AND RETAILQQ Cats Pte. Ltd.
Cooling for the café, and ventilation to clear odour from the cat area. The extract run carries a silencer, because a fan loud enough to notice gets switched off.
What we did: Installation · Ventilation · ServicingRead the case →





